OEE software for wineries and beverage plants
On a packaging line, the filler sets the pace: every minute it stops is production the whole line fails to deliver.
MTSolutions measures every machine on the line in real time, logs every stop with its cause and shows you where the capacity you already have is being lost. We work with Viña Concha y Toro, Viña Undurraga and Pernod Ricard.
The 3 typical losses on a packaging line
Micro-stops nobody writes down
A fallen bottle, a jam at the labeler, a shortage of cases. They last a few minutes and are almost never recorded, but added up over the month they weigh as much as a major failure.
Changeovers that run longer than planned
Every change of bottle, label or case stops the line. Without automatic measurement, the real time of each changeover is an estimate and cannot be compared across shifts.
Actual speed below rated speed
The line is running, but slower than it can. That gap does not show up in any manual record, and it is capacity you have already paid for.
A packaging line, machine by machine
- FillerProducing
- LabelerStopped · cause logged
- Case packerProducing
- PalletizerProducing
Illustrative diagram. Each machine is connected separately, so you can see which one stops the others.
We read the signals from your machines as they are, without changing what already works. Installation takes as little as 1 hour per machine: at Viña Concha y Toro we connected 8 machines in 2 weeks. Check which machines and systems we connect to.
Modules that apply to wine and beverages
MTcontrol: OEE and stops
Measures the real OEE of every line, every stop and its cause, shift by shift.
MTvision: machine vision
Inspects every unit on the line with industrial cameras and AI models.
MTflow: processes and traceability
Digitizes forms, operator checks and the traceability of every order, by process and station.
MTenergy: energy management
Monitors the plant's energy consumption in real time, synchronized with production.
MTmanual: digital records
Replaces spreadsheets and paper forms with digital production records at the workstation itself.
Ultimate AI: AI for your plant
An AI trained in manufacturing that tells you where you lose production, why, and what to tackle first.
Sector case study: Pernod Ricard
Double the production
With no new machines and no added shifts.
+37 OEE points
OEE improvement measured with automatic data from the line.
+37% average speed
From 4,008 to 5,474 bottles per hour. This is the line's flow (average speed), not total production.
Read the full Pernod Ricard case study or see all case studies.
What wine and beverage plants say
+8% operational efficiency
«In the last six months we increased operational efficiency by 8% thanks to real-time monitoring.»
Emilia MartínezContinuous Improvement Analyst · Pernod Ricard Argentina Watch the videoFrom an hour and a half to 15 minutes
«What used to take me an hour or an hour and a half to put into Excel, I now have in 10 or 15 minutes, with all the information. Adapt to the change, it makes everything easier.» «Something I love is that from my phone I can be monitoring my line in real time... it makes your life easier.»
Néstor Jiménez BarajasPackaging Operations Coordinator · Pernod Ricard México Watch the video«Having a management platform like this will definitely pay off in improvements that ultimately translate into significant savings for the company.»
Carlos Eduardo LópezHead of Industrial Automation · Viña Concha y Toro Watch the video«Having the production manager tell me “today I’m in the green on all three lines”... radically changed the operation. The operators took ownership of their process.»
Enzo RobbianoDeputy Production and Planning Manager · Viña Undurraga Watch the video
Frequently asked questions
Does it work on packaging lines with machines of different brands and ages?
Yes. We read the signals from the machine, so it does not depend on the brand or age of the equipment. We connect to virtually any machine or system. If you don't see yours, we'll connect it anyway.
How long does implementation take in a beverage plant?
Installation takes as little as 1 hour per machine and is done by our own technical team. A typical project takes about 6 weeks from the first visit to the Proof of Count.
What happens if the internet goes down at the plant?
The capture device stores about 190 days of data at the plant and syncs it when the connection comes back.
Do I have to buy equipment?
No. The hardware is on loan at no cost: you don't buy equipment. We don't invoice until the data matches your reality. You can leave with 30 days' notice.
Does it integrate with my ERP?
Yes. We integrate with SAP, your ERP or your MES if you need it.
See a packaging line like yours, measured in real time
In the demo we review a line like yours and show you what the AI answers with real data. We don't invoice until the data matches your reality. The hardware is on loan at no cost: you don't buy equipment. You can leave with 30 days' notice.