Skip to content
Book a FREE demo with my data
  1. Home
  2. Blog

OEE calculator: calculate your OEE in 1 minute

OEE (overall equipment effectiveness) is the metric that measures how much of a machine's planned time was turned into good units at ideal speed. You calculate it by multiplying availability, performance, and quality. With this calculator you get all four values for a shift or an order from just five inputs.

By the MTSolutions teamUpdated:

Calculate the OEE of a shift

OEE: the formula and what each component measures

OEE = Availability × Performance × Quality

  • Availability = (planned time − stops) ÷ planned time. It measures how much of the time the machine was supposed to produce it was actually running.
  • Performance = (ideal cycle × units produced) ÷ run time. It measures whether, while it was running, the machine produced at the speed it was designed for.
  • Quality = (units produced − units rejected) ÷ units produced. It measures how much of what was produced came out right the first time.

There is a shortcut for checking your OEE calculation without going through the three components: OEE = (good units × ideal cycle) ÷ planned time. If the two paths don't give the same answer, one of the inputs was entered wrong.

If you want the concept explained before you calculate, read what OEE is.

How to define the five inputs correctly

The formula is simple. What makes two people get different results for the same shift is how each of them defines the inputs.

Planned time

This is the time the machine was supposed to produce. Start with the full shift and subtract only what you decided in advance not to produce: meal breaks when the line stops by design, scheduled maintenance, and hours with no work loaded. Everything else stays in, even if it's uncomfortable: changeovers, cleaning, waiting for material, no operator available, and failures. If you take those losses out of planned time, OEE goes up and the problem disappears from the metric, not from the plant.

Stops

This is the sum of all the minutes the machine did not produce within planned time. You'll also hear them called stoppages or downtime events. Include the short ones. If you only add up the stops that were written down, the rest will show up as low performance.

Ideal cycle

This is the time it takes to produce one unit under the best conditions, for that product and that format. Use the manufacturer's design speed or, if the machine has been modified, the best rate it has demonstrably sustained. Don't use the historical average or the cost standard, because both already have losses built in. If the machine runs several products, each one has its own ideal cycle.

Units produced and units rejected

Units produced are all the units that came out of the machine, good and bad. Units rejected include scrap and also anything that had to be reworked: the quality component of OEE counts only what came out right the first time. Use the same unit throughout the calculation (bottles, cases, pounds, or feet).

OEE calculation: a worked example, step by step

A filler runs a shift with 480 planned minutes. It was stopped for 48 minutes. Its ideal cycle is 2 seconds per unit. It produced 11,000 units and 220 were rejected.

  1. Availability: (480 − 48) ÷ 480 = 432 ÷ 480 = 90.0%.
  2. Performance: at 2 seconds per unit, 11,000 units need 366.7 minutes. 366.7 ÷ 432 = 84.9%.
  3. Quality: (11,000 − 220) ÷ 11,000 = 98.0%.
  4. OEE: 0.900 × 0.849 × 0.980 = 74.9%.

Checking with the shortcut: 10,780 good units × 2 seconds = 359.3 minutes. 359.3 ÷ 480 = 74.9%.

How to read it: for every 100 planned minutes, the line delivered the equivalent of 75 minutes of perfect production. The biggest loss is not in the stops (10 points) but in speed (15 points): the machine was running, but slower than its ideal cycle or with micro-stops nobody wrote down.

The same result is easier to grasp on the plant floor when you express it in units. In 480 minutes, at ideal cycle, the filler could have delivered 14,400 units. It delivered 10,780 good ones. The 3,620 missing units break down like this: 1,440 lost to stops, 1,960 lost to speed, and 220 lost to rejects.

Second example: the OEE of an order with a changeover

A thermoformer runs an order that takes up 360 planned minutes. There is a 45-minute changeover at the start and a 15-minute failure later on. The ideal cycle for that format is 6 seconds per unit. The order yields 2,550 units and 102 are rejected, almost all of them during startup.

  1. Availability: (360 − 60) ÷ 360 = 300 ÷ 360 = 83.3%.
  2. Performance: 2,550 units × 6 seconds = 255 minutes. 255 ÷ 300 = 85.0%.
  3. Quality: (2,550 − 102) ÷ 2,550 = 96.0%.
  4. OEE: 0.833 × 0.850 × 0.960 = 68.0%.

Of the 360 minutes, 244.8 became good product. The other 115.2 went to stops (60), speed (45), and rejects (10.2). The changeover alone accounts for 45 minutes, and it also drags along a good share of the rejects. If you had left it out of planned time, availability would have come out at 95.2% and nobody would be looking at the changeover.

How to interpret the OEE metric

OEEWhat it usually meansWhere to look first
Below 40%Common in plants measuring with automatic data for the first timeLong stops and material shortages
40% to 60%Typical range in discrete manufacturing without real-time measurementChangeovers and micro-stops
60% to 85%A controlled operation with clear room for improvementActual speed versus rated speed
85% or higherThe benchmark that TPM literature calls "world class" (90% availability, 95% performance, and 99.9% quality)Sustaining it shift after shift

These ranges are a general reference, not a universal target. An OEE of 85% on a continuous line can't be compared with the OEE of a machine that does twenty changeovers a day. What's useful is comparing the same line against itself, shift after shift.

The six big losses and which component each one affects

TPM literature groups everything that lowers OEE into six losses. They help you get from the percentage to the cause.

LossComponentWhat it looks like on the floor
Equipment failuresAvailabilityAn unplanned stop that requires maintenance to step in
Setup and adjustmentsAvailabilityChangeovers, cleaning, and adjustments until the first good unit
Micro-stops and short waitsPerformanceJams the operator clears in seconds and nobody writes down
Reduced speedPerformanceThe machine runs below its ideal cycle because of wear, material, or habit
Startup rejectsQualityBad units until the process stabilizes after a start or a changeover
Production rejectsQualityScrap and rework once the process is already stable

The two in the middle are the ones least often recorded by hand. That's why performance is the component that surprises people most when they start measuring from the machine signal. More detail in what downtime is and how to detect it.

How to calculate OEE for a machine, a line, and the plant

By machine is the calculation on this page: one piece of equipment, one period, one ideal cycle.

By line, when the machines are connected in series, OEE is measured at a single point: the machine that sets the pace (the bottleneck) or the end of the line. Multiplying or averaging the OEE of each machine on the line does not give you the OEE of the line, because an upstream stop already shows up as waiting time on the others.

By plant, or for several lines, you weight by planned time. Here's an example with three lines in one day:

LinePlanned timeOEEMinutes of perfect production
A480 min80%384
B480 min60%288
C160 min40%64
Total1,120 min65.7%736

The simple average of 80%, 60%, and 40% is 60%. The correct value is 736 ÷ 1,120 = 65.7%, because line C worked only a third of the time and carries less weight. The same rule applies when you combine shifts, days, or products: you add up the minutes, you never average the percentages.

OEE, TEEP, and productivity: three different questions

  • OEE answers: of the time I planned to produce, how much did I put to good use?
  • TEEP answers: of all the time on the calendar, how much did I put to good use? It is calculated as OEE × utilization, where utilization = planned time ÷ calendar time.
  • Productivity answers: how much did I produce for each resource I used (labor hours, energy, raw material)?

If the filler in the first example is scheduled for two 480-minute shifts in a 1,440-minute day, its utilization is 66.7% and its TEEP is 74.9% × 66.7% = 49.9%. OEE is for managing the shift's operation. TEEP is for deciding whether it makes sense to add a shift before buying another machine. And a line can raise its OEE with twice as many operators: OEE doesn't see that, productivity does. None of them replaces the others.

Common mistakes when calculating OEE

  • Calculating it from handwritten records. Short stops don't get written down, so availability looks better than it is. When you measure from the machine signal, OEE usually drops several points compared with the spreadsheet.
  • Using the "usual" speed as the ideal cycle. With a relaxed cycle, performance comes out at 100% even when the line is running slow.
  • Performance above 100%. It means the ideal cycle is defined wrong. The calculator warns you about it.
  • Taking the uncomfortable items out of planned time. Changeovers and waiting for material are losses: they stay in.
  • Averaging percentages. You weight by planned time, as in the table above.
  • Looking only at the final number. Two lines at 65% can have opposite problems. Decisions are made with the three components and with the cause of each stop.
  • Using it to reward or punish shifts. If the number has personal consequences, manual records get adjusted to fit. First you need data that doesn't depend on the person being evaluated.

What to do with an OEE that looks too good

An OEE above 95% sustained for weeks deserves a review before a celebration. Check four things: whether the ideal cycle is the design cycle, whether some stops are being deducted from planned time, whether rework is being counted as good units, and whether short stops are being recorded. If everything checks out, the result is real. In most cases, a generous assumption turns up.

How often to review the OEE KPI and who uses it

WhoHow oftenWhat they look atWhat they decide
OperatorDuring the shiftMachine status, units against the target, cause of the last stopRaise the alert, adjust, record the cause
Shift lead or supervisorEvery hour and at the end of the shiftThe three components by machine and the longest stopsWhere to put people and what to ask of maintenance
Production and maintenance managersDaily and weeklyPareto of causes, comparison across shifts and formatsWhich cause to go after this week
Senior managementWeekly and monthlyThe OEE trend in production, by line and plant, and what it is worth in capacityInvestments, shifts, and delivery commitments

An OEE you find out about at the end of the month helps you explain what happened. One you see during the shift helps you change it.

What to do after you calculate it

  1. If availability is the problem: classify each stop by cause and go after the two or three that add up to the most minutes. Review preventive maintenance and changeover times. To tell frequent failures apart from long failures, calculate the equipment's MTTR and MTBF.
  2. If performance is the problem: look for micro-stops and reduced speed. They almost never appear in manual records. The hidden losses calculator estimates what they are worth per year.
  3. If quality is the problem: separate startup rejects from production rejects, and tie them to the format, the shift, and the material lot.

A manual calculation is good for a snapshot. To manage, the data has to arrive on its own and on time. The guide to the OEE formula goes deeper into each component.

How OEE is measured automatically

MTcontrol takes the signals directly from each machine and calculates OEE in real time, by machine, line, and shift. The operator records the cause of each stop in 2 clicks: first the family, then the reason. Installation takes as little as 1 hour per machine and is done by our own technical team. It typically takes about 6 weeks from the first visit to the Proof of Count, which is when we compare the data against your own records. We only start billing once the data matches your reality.

If the plant loses its internet connection, the capture device stores about 190 days of data, so the shift doesn't go unmeasured. We connect to virtually any machine or system.

Real case: Pernod Ricard

Pernod Ricard, in the spirits industry, doubled its production and gained 37 OEE points, with no new machines and no added shifts. The capacity was already in the plant. What changed was knowing, shift after shift, where the time was going. Ask us if you'd like to see other customer results.

Other calculators

Frequently asked questions

What is the OEE formula?

OEE = Availability × Performance × Quality. Availability is run time divided by planned time; performance is actual output compared with what would have been produced at the ideal cycle; quality is the share of good units out of the total produced.

What is OEE and how is it calculated?

OEE is the percentage of planned time that a machine turns into good units at its ideal speed. You calculate it by multiplying availability, performance, and quality, or directly: good units times ideal cycle, divided by planned time. Both paths give the same result.

What data do I need to calculate OEE?

Five inputs: planned production time, minutes of stops, the machine's ideal cycle in seconds per unit, units produced, and units rejected. All of them must cover the same period and the same product: a shift, an order, or a day.

How do I calculate OEE for a machine that runs several products?

Each product has its own ideal cycle. For each order, calculate the minutes of perfect production (good units times the ideal cycle for that product), add them up, and divide by total planned time. Don't use an average cycle: it hides the losses of the slow formats.

What is a good OEE?

TPM literature cites 85% as the world-class benchmark, but it depends on the process, the number of changeovers, and how planned time is defined. The most useful approach is to compare the same line against itself and check which of the three components explains the loss.

Why is my performance above 100%?

Because the ideal cycle you entered is slower than the machine's actual speed. Correct the ideal cycle using the design cycle or the best sustained rate the machine has demonstrated for that product. Performance above 100% is never good news: it's a poorly defined input.

Do changeovers count as stops in OEE?

Yes. A changeover happens during the time the machine was supposed to produce, so it reduces availability. If you take it out of planned time, OEE goes up, but you stop seeing one of the easiest losses to reduce through preparation and standardization.

How often is OEE calculated?

At least once per shift. With automatic measurement you see it in real time and review it by machine, line, shift, product, and order. The operator uses it during the shift, the supervisor at the end of the shift, and management looks at the weekly and monthly trend.

What is the difference between OEE and TEEP?

OEE compares good production with the time you planned to produce. TEEP compares it with all the time on the calendar, including unscheduled shifts. TEEP equals OEE times utilization. It helps you decide whether there is capacity available before you invest in equipment.

Is the OEE calculator free? What happens with my data?

It's free. To show the result we ask for your name, email, and phone number, and we use them to contact you about your result in accordance with our Privacy Policy. The numbers you enter in the calculator are sent along with the request.

Ask your plant

Book a demo and see, with real data, where your line is losing time.

Book a FREE demo with my data

Free tools: OEE calculator · MTTR and MTBF calculator · Hidden losses calculator · Meet MTcontrol